Services See all → Strategic planningCulture and engagementAccountability and executionProblem solvingHigh performance teamsLean and kaizen
Methods See all → Fishbone diagram5SPoka yokeFMEA
AboutCase studiesBlog Book a call Español
Strategic planning · November 24, 2026

The strategic plan that falls apart every Monday

A chain of interlocking gold geometric links descending from a warm sand diamond toward a teal baseline, with one link near the end left open and disconnected

An eight hour strategy workshop leaves you with the map, the initiatives and the closing photo. The first Monday after, somebody in the production meeting has to decide something, and the map is not in that room.

Strategic planning that reaches the floor is the chain of decisions that connects that document to what somebody decides on Monday on the production floor, so the plan does not sit still on the desk of whoever signed it.

The chain almost nobody draws

The strategic plan defines where the company is going. The operating decision defines what gets done today on that line. Follow up defines whether what got decided actually happened. Three links, and almost no plant I walk into has them connected. It has the first one in a slide deck, jumps straight to the third in a monthly meeting, and leaves the middle link to whatever each supervisor decides on their own.

Monday is the test

The plan breaks the following Monday, when a supervisor has to choose between two priorities and neither one says anywhere which one connects to the plan. They pick whichever makes less noise that week, which is almost never the strategic one, and nobody finds out until next quarter.

What Laura Simental said after the workshop

"A transformative experience that strengthened my strategic thinking and let me connect practical tools with my organization’s long term objectives," Laura Simental, Global Operations Quality, wrote after a strategic planning workshop. This is a translation of her original Spanish. The word I keep coming back to is connect. The workshop handed her the bridge between the tool she uses daily and the objective she already had.

What Karina Vega said about executing

"Sergio helped us see our larger growth challenge toward 2030 clearly, and how to execute the plan to reach our company objectives in the short term," said Karina Vega, Director General. This is a translation of her original Spanish. The full chain is in that one sentence: see the big challenge, and know how it gets executed in the short term.

How that chain gets built

I always start from the real context of the operation, not from a generic template that fits any company the same way. From there comes the strategy map with prioritized initiatives. What matters is the KPI with a name attached to it, and the rollout path that says who reviews what and how often. Without those two, the map stays on the conference room wall.

Three signs your plan never reached the floor

  • A line supervisor cannot say, without thinking about it, which strategic initiative connects to what they are doing today.
  • The plan’s KPIs never show up in a production meeting, only in the quarterly review with leadership.
  • Nobody can name who owns an initiative without going to look up the document.

What changes once the chain exists

The supervisor does not need to memorize the whole map. They need to see, on the board for their own weekly meeting, which indicator comes from which initiative and which decision this week moves that number. Once that exists, the Monday question stops being "what do I put out first" and becomes "which of these two decisions gets me closer to the quarter’s objective." Same workload. Only the question asked before deciding is different.

Where this fits

This is what I work on in a 4, 8 or 12 hour strategy workshop, and what I carry forward in a multi week coaching cycle: preparation, development, rollout and follow up. The workshop delivers the map the same day. What takes weeks is getting that map to survive the first Monday, and then the second.

Start here

Take your most important strategic initiative for this quarter and ask the nearest line supervisor whether they know it exists. If the answer is no, you already know where the chain is breaking, and that is where a strategic planning workshop starts.

How long does a strategic planning workshop take?

The strategy workshop runs 4, 8 or 12 hours and delivers the map and prioritized initiatives the same day. Rollout takes longer, which is why the 4, 8 or 12 week coaching cycle exists after it.

Does this work if we already have a strategic plan?

Yes, and it is often a better starting point. We work from that document and find where the chain to operations is breaking, which is almost always between the initiative and the indicator, or between the indicator and its owner.

How do I know if my plan actually reached the floor?

Ask a line supervisor, without warning them first, whether they can name the strategic initiative that connects to what they are doing today. If they cannot, the plan has not reached the floor yet.

← Back to the blog

Next step

What is holding your operation back today?

Tell me the concrete problem. I will tell you whether it is mine to solve or someone else’s, and what I would do first.