What I know from the floor, written so you can use it on Monday
One article per tool, with the mistake I see most often and how to fix it. No loose theory.
SMED: getting changeover down to a single digit
Two hours of changeover, the line stopped, the supervisor watching the clock. Nobody separated yet what the stopped machine requires from what could have been ready beforehand.
Read →
Kanban on the floor: the card that stopped moving
The card leaves the station, it is supposed to come back, and one day it stops. Nobody notices until material runs short on one line or piles up on another.
Read →
Kaizen event: what happens after the week ends
Applause on Friday, a clean board, before and after photos. And the question nobody answers that same week: what happens next Monday.
Read →
Lean manufacturing: the part nobody installs first
A kanban board, a kaizen event on the calendar, even a couple of certified green belts. And the one question that should have come first, still unanswered.
Read →
8D step by step: the format your customer will ask for
The formal complaint lands and the email asks for "a complete 8D by Friday." Half the plants I know open the last one they closed and swap the part number.
Read →
The A3 report: one page that orders a whole problem
A twenty slide deck on the same problem, and by slide twelve nobody remembers what slide five said. One A3 sheet tells the whole story at a glance.
Read →
Root cause analysis: the evidence I ask for first
"I think it was the material," somebody says, with the confidence of a person who has seen it before. Nobody asked for the lot certificate.
Read →
The 5 whys: why almost everyone stops at number three
Three whys in, and the whiteboard already has a name on it. That name marks the exact point where the team stopped asking.
Read →
FMEA: why yours has not reduced a single defect
The PFMEA passed the audit. Two hundred lines, every action closed. And scrap is exactly where it was a year ago.
Read →
Poka yoke examples you can copy this week
The operator is in hour eight and the part goes in backwards once in a while. Retraining will not fix it. A stop block will.
Read →
5S audit: the five minute check that makes it hold
The area was spotless for the customer visit. Three months later nobody can find the torque wrench. What was missing fits in five minutes.
Read →
Fishbone diagram: why yours is not working
Twelve branches filled in and not one proven cause. That is how most of them end, and the defect comes back next month wearing a different name.
Read →What is holding your operation back today?
Tell me the concrete problem. I will tell you whether it is mine to solve or someone else’s, and what I would do first.